Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 14 results ...

Amirkhanian, S N, Burati, J L and Mirchandani, H C (1994) Effect of Testing Variability on Contractor Payment for Asphalt Pavements. Journal of Construction Engineering and Management, 120(03), 579–92.

Cohenca‐Zall, D, Laufer, A, Shapira, A and Howell, G A (1994) Process of Planning during Construction. Journal of Construction Engineering and Management, 120(03), 561–78.

El‐Itr, Z and Kangari, R (1994) Minority Contractors: Framework for New Policy Development. Journal of Construction Engineering and Management, 120(03), 632–48.

Everett, J G and Farghal, S (1994) Learning Curve Predictors for Construction Field Operations. Journal of Construction Engineering and Management, 120(03), 603–16.

  • Type: Journal Article
  • Keywords: Training; Construction methods; Mathematical models; Productivity; Construction management; Construction costs;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1994)120:3(603)
  • Abstract:
    Many repetitive construction field operations exhibit a learning curve, over which the time or cost per cycle decreases as the cycle number increases. This paper evaluates several mathematical models to determine which best describes the relationship between the activity time or cost and the cycle number. For completed activities, cubic learning curve models are found to provide the most reliable statistical fit, and linear models provide the least reliable fit. The real potential value of learning curves is their ability to predict the time or cost needed to perform future activities. This paper presents a methodology for predicting future activity time or cost based on completed activity data. The best predictors of future performance are found to be linear models. The cubic models that best describe completed activities are poor predictors of future performance.

Gavilan, R M and Bernold, L E (1994) Source Evaluation of Solid Waste in Building Construction. Journal of Construction Engineering and Management, 120(03), 536–52.

Gugel, J G and Russell, J S (1994) Model for Constructability Approach Selection. Journal of Construction Engineering and Management, 120(03), 509–21.

Jergeas, G F and Hartman, F T (1994) Contractors' Construction‐Claims Avoidance. Journal of Construction Engineering and Management, 120(03), 553–60.

Laborde, M and Sanvido, V (1994) Introducing New Process Technologies into Construction Companies. Journal of Construction Engineering and Management, 120(03), 488–508.

Mahoney, J J and Tatum, C B (1994) Construction Site Applications of CAD. Journal of Construction Engineering and Management, 120(03), 617–31.

Reyna, S M, Vanegas, J A and Khan, A H (1994) Construction Technologies for Sewer Rehabilitation. Journal of Construction Engineering and Management, 120(03), 467–87.

Suhail, S A and Neale, R H (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(03), 667–84.

Swiggum, K E, Anderson, S D and Russell, J S (1994) Case Study of Burlington Cable‐Stayed Bridge. Journal of Construction Engineering and Management, 120(03), 649–66.

Tsimberdonis, A I and Murphree, E L (1994) Equipment Management through Operational Failure Costs. Journal of Construction Engineering and Management, 120(03), 522–35.

Woolery, J C (1994) Developing Specifications for Cellular‐Telephone Base Stations. Journal of Construction Engineering and Management, 120(03), 593–602.